Office renovations: part 2
After work on Monday, I was pretty satisfied with the paint work (I took the opportunity to have HammerBarn take another crack at matching the ceiling paint, which they did very well on, I can’t tell where the hooks and so on were, at all!) so I took up all of the masking and drop sheets and started moving my things back in.
That concluded on Tuesday night after work. I don’t have everything back in (the garage is still overloaded with my bullshit) but enough that I can work in there. I’ve been planning out the shelving in what used to be the closet (I’ll have a half a workbench, with built-in shelving everywhere else, and I’ll preserve the ability to put the sliding closet doors back on if I want to at some point).